View previous topic :: View next topic |
Author |
Message |
juwi_uk
Joined: 10 Mar 2014 Posts: 47
|
Posted: Sat May 03, 2014 7:40 pm Post subject: Extended Trial Days |
|
|
Hi
Can you clear up a simple confusion for me. If I set
evaluationDialog.TrialDays = 30
evaluationDialog.ExtendedTrialDays = 45
It the max trial period a user can use for albeit with increasing time delays 45 days or 75 days.
Julian |
|
Back to top |
|
|
Infralution
Joined: 28 Feb 2005 Posts: 5027
|
Posted: Sun May 25, 2014 11:04 pm Post subject: |
|
|
The maximum period would be 45 days - then the button no longer becomes enabled at all. _________________ Infralution Support |
|
Back to top |
|
|
|